HOLIDAY SCHEDULE
05 repairing model with stronger adhesive and applying magnets to new parts.
06 buying materials, printing first set of files, finding out about the press for portfolio,building more of the prorotype
07 light models, light tests,finish model for CNC and send to Monia, parents wedding anniversary dinner.
08 light models, light tests, revision of portfolio, visiting light installations (that are all over Milan for Design Week)
09 voting, light drawing, revision of files
10 doctors appointment light models and drawings+CNC if it needs more work
11 prorotype+new drawings+layout of intro pages
12 prorotype+new drawings(TS)
13 prorotype+new drawings(TS)
14 prorotype+new drawings
15 prototype,finishing off all files, printing
16 Flying back to London_reading for Histories and theories
17 finishing prototype, buying more material if necessary,writing essay
18 finishing book-paper model and revision of booklet,putting together portfolio....
today added the magnets.Although I think it is so much better with the magnets, it doesn't thoroughly work, they aren't strong enough through the felt. will do a few more but most will be without, the process is long enough already. Aiming to make the prototype 4X3m, trying to make it blend into wall as much as possiblle. tomorrow will find different materials with different reflective properties to change with the white in a part of the prototype, see if the warmth of the light changes too.