Hooke Schedule
○1Prototype_01 (laminated plywood) / 2 way folding
○2Prototype_02 (aluminum) / 3 way folding
13Mar(tue) / day_1
Arriving
14Mar(wed) / day_2
-○1Curving Test (3 angles, 86.00 / 38.00 / 90.00 ) with laminated ply
-○1Curving Test-2 / glued joint test
-○1CNC preparation (perforation test-1)
-○1○2Making Base Form……
-Material’s arriving (1.5mm ply 1.5msq * 4)
-Order extra material (1.5mm ply * ? / super glue gel )
-Confirm schedule with Nathasha
15Mar(Thu) / day_3
-○1CNC cutting (perforation)
-Confirm Final Design
-○1○2Making zig for specific curve (from previous day test)
16Mar(Fri) / day_4
-Material’s arriving (1.5mm aluminum sheet 2m×1m*4)
-○2cutting sheet (all day)
*decide for final output (with time schedule) whether ply or alum.
17Mar(Sat) / day_5
-○2Curving Test (3 angles, 86.00 / 38.00 / 90.00 ) with laminated aluminum
-○2Curving Test-2 / glued joint test
-○2Riveting
18Mar(Sun) / day_6
-○1CNC preparation (for all the components)
19Mar(Mon) / day_7
Working day (curving, laminating, assembling into one )
20Mar(Tue) / day_8
Working day
21Mar(Wed) / day_9
Working day
22Mar(Thu) / day_10
?
23Mar(Fri) / day_11
Leave Hooke Park