« Loose folding for Superwall | Main | Hooke Schedule »

Hooke proposal

4.jpg

I chose most complex joint of escalator core as well as structural core and will work in scale of 1:20 since original is 8 m high.

About

This page contains a single entry from the blog posted on March 10, 2007 5:18 PM.

The previous post in this blog was Loose folding for Superwall.

The next post in this blog is Hooke Schedule.

Many more can be found on the main index page or by looking through the archives.

Powered by Movable Type 3.32
Hosted by LivingDot